|
Systems & Procedures
Procedures within the Plan Vivo System are designed
to ensure that carbon offsets are verifiable, that activities help
promote sustainable development and that participation by producers
is voluntary. These procedures are divided into the following main
areas:
- selecting target groups
- annual planning cycle
- carbon accounting
- systems review
It is recognised that social and environmental
conditions and legal requirement differ from country to country
and it is recommended that each Plan Vivo project adjusts these
procedures to suit local circumstances using the information and
templates provided in these pages as guidance.
Projects should set out their systems in a project
operational manual. This will be a key requirement for verification.
Procedures should not be set in stone and may be modified as experience
is gained, however the operational manual should be a controlled
document; the procedures through which the manual can be modified
should be stated and the date of any revision recorded.
See an example of an operational manual from
the Scolel
Té project.
|